Primary Contact: |
Nate Olds |
Google | Outlook | Outlook.com (Office 365) | iCal | Other
In this training we will review the Burnham product lineup of Condensing Boilers focusing on installation, set up, operation, and troubleshooting of the Burnham Alta Boiler. We will also cover hydronic boiler piping which includes, hydronic pipe sizing, best practices, importance of air elimination, primary secondary piping, reverse return, direct return, and the importance of hydronic water quality.
Speaker: Rick Johnson
Registration closes one week prior to start date. If minimum number of students is not met, Behler-Young reserves the right to cancel the class. Students will be notified by the email entered at registration.
Minimum number of students required: 8
Google | Outlook | Outlook.com (Office 365) | iCal | Other